Flagship project · Eeyou Istchee James Bay, Nunavik, Québec
Banana Lithium Project
67,245 hectares of 100%-owned, district-scale lithium ground in one of the world's premier hard-rock lithium jurisdictions.
A rare, district-scale land position
WhiteRock controls 67,245 hectares of prospective, 100%-owned LCT pegmatite terrain in the Eeyou Istchee James Bay and Nunavik regions of Québec, with the region also hosting some of the most significant hard-rock lithium discoveries of the past decade.
Two major prospects already confirmed, Spodumene Mountain and Isabella. Strike of over 1 km trending NNW is open both to the north and south as well as down dip. Large prospective areas of greenstone belt geology — many outcropping pegmatites have yet to be drill tested. True scale is yet to be revealed.
(Cube Consulting / IGR, 2025, JORC 2012).
| Target Area | Tonnes Range (Mt) | Li₂O Range (%) | ||
|---|---|---|---|---|
| Minimum | Maximum | Minimum | Maximum | |
| Spodumene Mountain | 70 | 100 | 1.2 | 1.6 |
| Isabella | 110 | 160 | 1.2 | 1.6 |
| Marine | 10 | 15 | 1.2 | 1.6 |
| Total Exploration Target* | 190 | 275 | 1.2 | 1.6 |
*The Exploration Target and its potential quantity and grade is conceptual in nature, there is currently insufficient exploration to estimate a Mineral Resource and there is no certainty that further exploration will result in an estimation of a Mineral Resource or Ore Reserve. The Exploration Target is based on the interpretation of the pegmatites at the Spodumene Mountain, Isabella and Marine prospects using the 2024 drill hole information, drill core assays, and detailed surface mapping and sampling as detailed further in the Prospectus. A total of 29 diamond drill holes for 7,844.3 m and 4,878 drill core samples were used to inform the Exploration Target. To test the validity of the Exploration Target the Company commenced a systematic diamond drilling exploration program in 2026 of known spodumene pegmatite clusters and corridors, these programs will extend over several years.
Project strengths
The fundamentals of a lithium mine, in one place
The Banana Lithium Project combines high-grade spodumene pegmatite, starting at surface, with shallow continuation of mineralization and clean metallurgy results. Combined with the support offered by nearby regional infrastructure, these strengths set the project apart.
Spodumene pegmatite, exposed at surface
Thick intercepts of high-grade spodumene pegmatite, from surface or shallow depth. Multiple, stacked pegmatites discovered, shallow dipping at 20 to 30 degrees to the east. Two main prospects, Spodumene Mountain and Isabella. The focus of the 2026 drill program was Spodumene Mountain.
Successful drilling results
WhiteRock's maiden 2024 program was extremely successful, with 7,844 metres drilled across 29 drill holes. All the holes hit LCT mineralization at / near surface with high grades of 2–3% encountered in many holes. The 2026 program has focused on development drilling to prove up a maiden Mineral Resource Estimate, depending on results.
The 2026 campaign (July to October) delivered 65 drill holes totaling 19,481 metres, marking a significant step in the evaluation of the Spodumene Mountain lithium-caesium-tantalum (LCT) pegmatite system. The program was designed to assess the geometry and continuity of the pegmatites through systematic drilling on a 100 x 100 m grid. An area with a strike length of approximately 1,400 m and 500 m down dip has been delineated through drilling and outcrop mapping with every drill hole intersecting pegmatite. The system remains open along strike and down dip.
Coarse grained, clean mineralogy
Test work showed, on average, a coarse grain size, particularly at Spodumene Mountain. XRD showed >95% of lithium was present as spodumene with very low lepidolite observed. Also low iron levels, and no muscovite, which is important for meeting battery specifications. High recoveries, up to 87% in HLS test-work, suggest a DMS-only flowsheet could be employed.
Infrastructure advantages
Significant infrastructure is already in place within the local region, including hydro power, airstrip capable of handling jet aircraft, all-weather road and an exploration camp. In addition, Le Grande Alliance, a C$4.7 billion agreement between the Quebec Government and The Cree Nation aims to bring development to the region.
- ~55 km to the all-season Trans-Taïga Road
- ~50 km to the Laforge-2 hydroelectric facility
- $4.7B La Grande Alliance regional development
Use of funds
Funded for the 2026 program
The IPO raise funds an expanded 2026 field campaign, stepping the Banana Lithium Project toward a maiden Mineral Resource. Indicative allocation of the net proceeds:
Maiden resource targeted 1H 2027
The story is just beginning
Follow WhiteRock Lithium as it drills the Banana Lithium Project, the newest large-scale hard-rock lithium discovery across the prolific Eeyou Istchee James Bay – Nunavik regions of Québec.