ASX-listed · WLC

Advancing the Banana Lithium Project in Québec

A potential large-scale, high-grade spodumene discovery.

By the numbers Scroll through ↓
  1. 01 Tenure
  2. 02 Exploration target
  3. 03 Metallurgy
67,245 hectares, 100% owned

A district-scale land package across the Eeyou Istchee James Bay and Nunavik regions of Québec.

190–275Mt at 1.2–1.6% Li₂O

Conceptual Exploration Target across the project (Cube Consulting / IGR, 2025, JORC 2012).1

Met Testing Results of up to 87% Li recovery

are indicative of DMS-only flowsheet

1 The Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain whether further exploration will result in the estimation of a Mineral Resource.

2024 drill program

Every one of our 29 diamond holes intersected LCT pegmatite.

7,844 metres across the Spodumene Mountain, Isabella and Roloh prospects, confirming district-scale continuity and setting up a maiden Mineral Resource Estimate in 2027.

Five reasons the project stands apart

  1. 01 Scale Wholly-owned lithium exploration rights across approximately 67,245 hectares.
  2. 02 Grade High grade lithium mineralization intersected in numerous drill holes, at and near surface
  3. 03 Metallurgy Road, hydro power. Air strip and exploration camp near site and the region to benefit from Le Grande Alliance
  4. 04 Infrastructure Road, hydro power and airstrip access inside the La Grande Alliance development corridor.
  5. 05 Team A board and management team with deep lithium, capital-markets and operating experience.
Banana Lithium Project location and infrastructure map, Québec

Banana Lithium Project

100%-owned and district-scale, in the established mining jurisdiction of Eeyou Istchee James Bay & Nunavik, Québec, alongside some of the sector's most significant hard-rock lithium discoveries.

2024 results

All 29 drill holes (7,844 m) intersected LCT mineralisation. Multiple stacked pegmatites discovered, shallow dipping.

  • Tenure: 67,245 ha, 100% owned
  • Metallurgy. HLS testwork yielded up to 87% recovery indicating DMS-only flowsheet possible
  • 2026 program: Up to 4 drill rigs, infill and extension drilling July-Oct
  • Maiden Mineral Resource Estimate: targeted 1H 2027
Project detail

Infrastructure advantage

De-risked by location

~30 km

to the all-season Trans-Taïga Road

~50 km

to the Laforge-2 hydro facility

C$4.7 Bn

La Grande Alliance between Quebec Government and the Cree Nation – regional development program

Backed by an experienced team

Meet the full team
Whiterock Banana Project Core Shack
WhiteRock's field vehicle fleet at the Banana Lithium Project camp at dusk
Field logging at the Banana Project
Whiterock Field Crew Banana Project

Investors at a glance

Live share price, ASX announcements, investor presentations and financial reports for WhiteRock Lithium Corp (ASX: WLC).

WhiteRock Snapshot

Key facts, project highlights and upcoming milestones.

View Fact Sheet